Yebis Engineering PLC Logo
PLC · Addis Ababa · Ethiopia
Start a Project
SEC_HYD-04 // PLUMBING, DRAINAGE & SANITARY // DIVISION 04
STANDARD: EBCS-9 / DIN 1988 / BS EN 12056PRESSURE: 12-BAR HOLD
DIVISION 04BUILDING PLUMBING, DRAINAGE & SANITARY NETWORKS

Pressure-Balanced Hydraulics. Zero-Leak Reliability Across Every Floor.

Complete building plumbing networks, acoustic wastewater drainage, multi-stage pressure booster skids, and precision sanitary ware installations engineered for apartments, commercial towers, healthcare facilities, and private residences.

Plumbing issues in multi-story buildings and homes cause extensive interior damage when corners are cut. From basement water reservoirs and variable-frequency booster systems to top-floor penthouses, our hydraulic team eliminates water hammer, prevents acoustic drain transmission, and guarantees 100% leak-free integrity through 12-bar pressure certification and laser-graded drainage slopes across Addis Ababa.

+
+
SPEC_CARD // HYD-04PRESSURE HOLD: 12-BAR CERTIFIED
Building Mechanical Room with Water Booster Pump Skid and Manifold
TRIPLEX BOOSTER PLANT // BUILDING WATER SYSTEMVFD ACTIVE
PRESSURE CLASS: PN20 PPR-C
DRAINAGE ACOUSTIC: < 20 dB(A)
TEST STANDARD: 12 BAR 24-HR
INSPECTION: 100% CCTV PASS
HYDRAULIC SPECIFICATIONS // SANITARY PERFORMANCE TELEMETRY
Hydrostatic Proof
12 Bar

24-hour certified pressure test hold ensuring zero micro-leaks in all walls and slabs.

Booster Redundancy
Triplex N+1

VFD automated inverter multi-pump skids ensuring consistent water pressure across all floors.

Drainage Acoustics
< 20 dB(A)

Mineral-reinforced acoustic uPVC soil and waste stacks eliminating flush noise in living spaces.

Backflow Prevention
Double Check

Dual-check valve contamination barriers isolating municipal water from building reserves.

Slope Precision
100% CCTV

Laser-aligned pipe gradient control verified by high-definition crawler camera inspection.

BUILDING HYDRAULIC PACKAGES

Core Plumbing & Sanitary Deliverables

STANDARDS: EBCS-9 // DIN 1988 // BS EN 12056
SUB-SCOPE 01 // POTABLE WATERPN20 PPR-C & MULTI-LAYER

Pressurized Potable Water Reticulation

Clean, hygienic hot and cold water distribution throughout buildings and homes. We use virgin-grade PPR-C fusion-welded piping with dedicated floor isolation valves, eliminating concealed joints and preventing water damage.

TECHNICAL SCOPE:
Thermal fusion-welded PPR-C piping networks
Centralized solar & electric hot water loops
Independent floor and unit isolation valves
Pressure-reducing valve (PRV) stations per zone
SUB-SCOPE 02 // DRAINAGE & VENTILATIONACOUSTIC MINERAL uPVC

Acoustic Soil, Waste & Vent (SWV) Stacks

Engineered gravity drainage networks that silently convey sanitary discharge without odor leakage or gurgling. Designed with generous inspection cleanouts, acoustic vibration-dampening brackets, and proper roof vents.

TECHNICAL SCOPE:
Mineral-reinforced acoustic drainage pipework
Anti-siphon trap seals & air admittance valves
Accessible vertical cleanout inspection doors
Kitchen grease interceptors & sediment traps
SUB-SCOPE 03 // WATER STORAGE & PUMPSAUTOMATED VFD CONTROLS

Basement Booster Skids & Sump Stations

Complete building water management: basement storage reservoirs, automated variable frequency booster skids, rooftop buffer tanks, and heavy-duty submersible sump pumps for basement drainage.

TECHNICAL SCOPE:
VFD stainless steel multi-stage booster pump skids
Submersible sewage & greywater sump pump stations
Basement rainwater & perimeter dewatering sumps
Underground composite & concrete reservoir plumbing
SUB-SCOPE 04 // SANITARY FITMENTSSWISS & EUROPEAN FITTINGS

Sanitary Ware & Architectural Fixture Fit-Out

Precision installation of high-end bathroom and kitchen sanitaryware: concealed in-wall cisterns, wall-hung toilets, thermostatic rain showers, sensor faucets, and handicap-accessible fixtures.

TECHNICAL SCOPE:
Concealed wall-carrier cistern installations (Geberit)
Wall-hung sanitaryware with laser alignment
Thermostatic concealed shower mixing valves
Sensor-activated commercial hygiene fixtures

5-Phase Building Plumbing Protocol

ZERO-LEAK ASSURANCE // 24-HOUR PRESSURE CERTIFIED
01PHASE 01

Hydraulic Demand & Pressure Zone Sizing

Calculation of peak water fixture units (FU), sizing of main risers, and planning pressure zones to guarantee uniform water flow from ground floor to penthouse.

GATE: HYDRAULIC SCHEMATIC APPROVAL
02PHASE 02

Sub-Slab & Underground Drainage Rough-In

Laser-guided trenching and bed preparation for underground sanitary lines, cast-in sleeve placements in foundation beams, and pre-pour inspection.

GATE: PRE-POUR GRAVITY SLOPE AUDIT
03PHASE 03

Vertical Supply Risers & Acoustic Stacks

Erection of vertical water supply risers, sound-dampened acoustic drain stacks, and horizontal distribution runs within ceiling plenums and drywall shafts.

GATE: 12-BAR HYDROSTATIC PRESSURE PASS
04PHASE 04

Booster Plant Room & Reservoir Plumbing

Installation of booster pump skids, float switches, pressure tanks, water filtration stages, and interconnecting manifold valving in mechanical rooms.

GATE: PUMP SKID AUTOMATION COMMISSIONING
05PHASE 05

Sanitary Fixture Trim-Out & Drain CCTV Verification

Setting and sealing of porcelain ware, faucets, shower valves, followed by a full CCTV camera crawler survey of all main sewer branches to guarantee zero blockages.

GATE: FINAL SANITARY CERTIFICATION & HANDOVER
HYDRAULIC BENCHMARK

Plumbing & Sanitary Compliance Matrix

EBCS-9 // DIN 1988 // BS EN 12056 // EN 13508
Subsystem Work PackageEngineering BaselineField Verification ProtocolStandardStatus
Potable Water Supply Network (Hot & Cold)12 Bar (1.2 MPa) for 24 HoursHydrostatic Pressure Test with Digital GaugeDIN 1988 / EBCS-9100% LEAK-FREE PASS
Gravity Soil & Waste Pipework Gradient1:50 (2%) Minimum Uniform FallDigital Optical Level & In-Pipe Laser DatumBS EN 12056-2VERIFIED SLOPE
Main Building Drainage Collector LinesZero Sag, Zero Debris ObstructionClosed-Circuit TV (CCTV) Crawler InspectionEN 13508-2CCTV CERTIFIED
Sanitary Trap Seal Water Depth50mm to 75mm Minimum Water SealDifferential Pressure Siphonage TestingBS EN 12056 / EBCSSEAL INTEGRITY PASS
Submersible Sump Ejector Cut-In / Cut-OutAutomated Dual-Float Level ActivationWater Chamber Simulated Flood TestingEN 12050-1DUAL RUN VERIFIED
DIVISION 04 // PLUMBING & SANITARY INTAKE

Designing Building Water Supply, Drainage, or Luxury Bathrooms?

Send us your architectural floor plans and plumbing schematics. Our engineers calculate accurate pipe sizing, pump heads, and sanitary fixture schedules to guarantee silent, leak-free operation for your building or residential home.

HEADQUARTERS: BOLE ROAD, ADDIS ABABA|PHONE: +251 91 151 7784|STATUS: 12-BAR CERTIFIED