Yebis Engineering PLC Logo
PLC · Addis Ababa · Ethiopia
Start a Project
SEC_BIM-02 // VIRTUAL DESIGN & BIM COORDINATION // DIVISION 02
SPEC: LOD 400 FEDERATIONSTATUS: ACTIVE COLLABORATION
DIVISION 02VIRTUAL DESIGN & BIM // LOD 400

Resolving The Build Before Groundbreaking. Zero Field Clashes.

Multi-disciplinary clash resolution, parametric 3D federated modeling, and structural-to-MEP reconciliation eliminating costly site redesigns across Ethiopian commercial and institutional projects.

Subterranean conduit clashes, structural beam core re-drilling, and HVAC duct conflicts compound rapidly once concrete is poured. Our Virtual Design & Construction unit executes digital fabrication models down to rebars, anchor bolts, and MEP branch penetrations — ensuring total spatial reconciliation prior to ground mobilization in Addis Ababa.

+
+
SPEC_CARD // BIM-02RESOLUTION: PRE-POUR ZERO CONFLICT
3D Building Information Modeling and Clash Detection Review
FEDERATED CLASH MATRIX // LOD 400TOLERANCE: ±0.00MM
MODEL COORD: UTM 37N ADDIS
COLLISIONS: 100% CLEARED
SOFTWARE: REVIT / NAVISWORKS
STANDARD: ISO 19650 COMPLIANT
ENGINEERING METRICS // SPATIAL RECONCILIATION DATUM
Parametric Standard
LOD 400

Fabrication-ready concrete, rebar & MEP shop components.

Clash Detection
100%

Pre-pour Navisworks & Revit hard/soft spatial interferences cleared.

Rework Reduction
-85%

Measured decrease in slab coring and beam sleeve modifications.

Scan-To-BIM Precision
±1.0MM

Terrestrial LiDAR 3D point cloud field verification.

Delivery Protocol
ISO 19650

Structured digital twin asset dossier for institutional facilities.

04 SPECIALIZED BIM DELIVERABLE UNITS

Integrated Coordination Deliverables

EXECUTION: ISO 19650 PROJECT DELIVERY
SUB-SCOPE 01 // FEDERATIONLOD 350 - 400

Multi-Discipline Federated Modeling

Architectural intent, reinforced concrete frames, structural steel connections, and MEP distribution synthesized into a single-source coordinate model before site groundbreaking.

TECHNICAL SCOPE:
Shared Coordinate Datum Setups (UTM 37N)
Revit-Tekla Structural Mapping
Cast Concrete Embedded Plates & Inserts
Mechanical Shaft & Riser Spatial Allocation
SUB-SCOPE 02 // INTERFERENCEZERO HARD CLASHES

Automated MEP Clash Matrix

Algorithmic collision detection in Autodesk Navisworks identifying interferences between post-tensioned tendons, gravity drainage falls, and HVAC ducts before rebar is tied.

TECHNICAL SCOPE:
Weekly BCF Coordination Workshops
Core Riser & Beam Sleeve Penetrations
Gravity Sanitary Fall Verification
Ceiling Void MEP Coordination
SUB-SCOPE 03 // LASER SURVEYPOINT DENSITY < 2MM

3D Laser Scanning & As-Built Verification

High-resolution terrestrial LiDAR scanning captures as-cast column plumbness, floor levelness, and sleeve alignments, overlaying variances directly against engineering models.

TECHNICAL SCOPE:
Terrestrial LiDAR Field Capture
Floor Slab Deflection Heatmaps
Curtain Wall Anchor Alignment Check
Underground Drainage & Utility Geo-Trace
SUB-SCOPE 04 // FABRICATIONLOD 400 READY

Shop & Rebar Detailing Dossiers

Computer-generated bar bending schedules, sleeve layout templates, and steel connection details extracted directly from the federated model with zero manual drafting error.

TECHNICAL SCOPE:
Automated Bar Bending Schedules (BBS)
Formwork Tie-Hole Layout Plans
Sleeve Penetration Shop Tickets
As-Built Subcontractor Sign-off

5-Phase BIM Coordination Protocol

SEQUENTIAL QUALITY GATES // ZERO FIELD REWORK
01PHASE 01

Existing Condition & Topographic Survey

High-accuracy topographic survey, property boundary registration, and existing underground utility mapping establishing true project datum elevations.

GATE: DATUM CONTROL APPROVAL
02PHASE 02

Multi-Trade Model Federation (LOD 350)

Consolidation of structural framing, architectural partitions, and MEP riser pathways into a unified coordinate system across all building levels.

GATE: FEDERATED MODEL AUDIT
03PHASE 03

Automated Clash Matrix & Spatial Resolution

Comprehensive collision detection rulesets executed weekly with structural and MEP discipline leads to resolve conflicts before steel is bent or concrete poured.

GATE: ZERO HARD CLASH CERTIFICATE
04PHASE 04

Pre-Pour Shop Drawing Generation

Extraction of dimensioned shop drawings, sleeve cutouts, embedded plates, and bar schedules stamped with exact site coordinates for field teams.

GATE: FABRICATION-READY RELEASE
05PHASE 05

As-Built Laser Scan & Asset Dossier Handover

Progressive post-pour LiDAR scans verifying as-built positions against the design model, culminating in an audited digital asset dossier for building facility management.

GATE: FINAL AS-BUILT & ISO 19650 HANDOVER
STANDARDS BENCHMARK

QA & Spatial Compliance Matrix

EBCS // ISO 19650 // DIN 18202 // BS 8666
Discipline InterfaceGeometric BaselineVerification ProtocolStandardStatus
Structural RC vs. MEP Riser Ducts±5.0mm Spatial ClearanceAutomated 3D Navisworks Collision EnvelopeISO 19650 / EBCS-2100% RECONCILED
Cast-in Slab Sleeve OpeningsLaser-Verified Spatial DatumTotal Station Laser Overlay Pre-Pour InspectionDIN 18202 Class 3PASSED (0 ERROR)
Rebar Bending Schedule DetailingZero Field Cutting / BendingFactory Rebar Fabrication & 3D Model InterlockBS 8666 / ASTM A615CERTIFIED LOD 400
Post-Tension Tendon Anchorages±2.0mm Profile ElevationVolumetric Rebar Clash SimulationPTI M10.2 / EBCS-2VERIFIED PRE-STRESS
Curtain Wall Anchors & Embeds±1.5mm Edge DeviationTerrestrial LiDAR Point Cloud Deflection HeatmapAAMA 501 / EN 13830SUB-MM MATCH
DIVISION 02 // TECHNICAL INTAKE DESK

Planning a Complex Multi-Disciplinary Build? Have Your Drawings Clash-Tested.

Submit your architectural, structural, and MEP CAD or BIM models. Our Addis Ababa engineering team runs a comprehensive spatial collision assessment to identify hidden field clashes and cost traps before concrete is scheduled.

HEADQUARTERS: BOLE ROAD, ADDIS ABABA|PHONE: +251 91 151 7784|STATUS: GRADE 1 ACCREDITED